The Aeris houses a centralized thermostatic mixing valve station and incorporates a dual ring main pump set. Tempered water is automatically dosed via a Cu-Ag (copper,silver) ionisation system via the integral control system.
Design and supply a high efficiency condensing hot water system and warm water reticulation package to replace existing Raypak boilers. Connect system to existing Edson 1000-litre stainless steel hot water storage cylinders. Reticulate the entire hotel with 50 Deg C tepid water to overcome high temperature water fluctuation delivery to hotel guests.
The Aeris houses a centralized thermostatic mixing valve station and incorporates a dual ring main pump set. Tempered water is automatically dosed via a Cu-Ag (copper,silver) ionisation system via the integral control system.
Remove point of use thermostatic mixing valves and convert 4 individual plantrooms to warm water systems. Utilising the existing Rheem commercial gas storage units and making modifications to become low-temperature, primary water storage systems. Installation of braised plate heat exchangers, primary water circulation pumps, controls and copper-silver ionisation disinfection systems.
The Aeris houses a centralized thermostatic mixing valve station and incorporates a dual ring main pump set. Tempered water is automatically dosed via a Cu-Ag (copper, silver) ionisation system via the integral control system.
Remove existing point of use thermostatic mixing valves and install warm water delivery system onto the existing Rheem, 200mJ commercial hot water systems.